Twin bridges carry both EB and WB lanes of US Hwy 20 over the Iowa River in North Central Iowa. The overall bridge length if 1,630' including a 5 span steel unit of 1,510' and 60" prestressed concrete girder approach spans on each end. The superstructure is supported on 120' tall concrete hammerhead piers with caps long enough to support both bridges. The two center piers are supported on 8' diameter drilled shafts extending nearly 90' to bedrock. The remaining piers are founded on driven piles.
Completed Time: 2003
Contract: $92.9 Million 1.7 Mile Bridge crosses Lake Dallas, Texas
Contract: $37.6 Million Jensen's 14th crossing of the Missouri River
Contract: $56,000,000 2,478' bridge with a span of 425'
Contract: $65,171,000 State Route 13 over the Cumberland River
Bridge Width: 77 ft. 11 in. Bridge Length: 1,686 ft 2 in. Project Cost: $49.99M
Contract: $14M 1,400 ft bridge over Hillebrandt Bayou
Contract: $43M Concrete Beam Bridge over Lake Texoma
Contract: $3,180,000 A connecting bridge over the Raccoon River
Contract: $878,697 Used a Value Engineering Proposal to change bridge design
Contract: $32.8M Jensen's 13th time crossing the Missouri River
The bridge is 2,670 feet long and is a 15 span structure with a maximum span of 450 feet over the navigation channel.
The $24M project was opened in the fall of 2008 ahead of schedule. The 1500 foot long bridge is a 6 span structure with a maximum span of 280 feet.
310' tied arch bridge
Contract: $14,537,501 Steel girder bridge replacement in Omaha, NE
Building a culvert for 2nd Ave
Contract: $85M 7-year project included 18 bridges
Contract: $61M 18 spans resulting in a total bridge length of 3,280 feet
Contract: $50,949,500 Crossing the Mississippi River
Contract: $82,860,000 Two extraordinary, large and complex cofferdams were built
Contract: $47.7M Deepest drill shafts in Louisiana at time of project
Contract: $11,431,000 Pedestrian Bridge connecting 15 miles of recreational trails
Contract: $6,982,870 Long bridge spans, falsework towers and multi-crane lifts
Contract: $14M Completed: December 2009